Connected
Changes sync as you work
Job Information
Filled in from the job record — nothing to re-type
Completed
- SPK number
- SPK-2026-0137
- Date
- 19 Aug 2026
- Customer
- SCBD Office Tower
- Site
- SCBD Office Tower — Level 8 · Jakarta Selatan
- Technician
- Andi Pratama
- Unit model
- POU Pro 200
- Unit serial
- POU-0439
- Ownership
- Rental
Site access: Tenant relations escort, service lift booking
Installation approved
This SPK has been approved and the unit is active. The record is read-only.
Installation Checklist
Confirm each item on site
7 / 7
Installation Notes
What was done, and anything the client should know
Photos
5 required photos
5 / 5 uploaded
Installed unit
Captured
Water connection
Captured
Drain connection
Captured
Power connection
Captured
Final installation / site
Captured
Client Signature
Signed on site by the client PIC
Captured
Signed by Ibu Fitri Handayani — Tenant Relations19 Aug 2026
Automatic validation
Checked by the system before the job can reach Admin Review
Ready to submit
- Installation checklist completed7 / 7 items confirmed
- Unit serial recordedPOU-0439
- Technician notes completed157 characters recorded
- Installed unit photo uploadedFull view of the unit in place
- Water connection photo uploadedInlet coupling and valve
- Drain connection photo uploadedDrain routing and outlet
- Power connection photo uploadedOutlet and cable routing
- Final installation / site photo uploadedWide shot of the finished area
- Client signature capturedSigned by Ibu Fitri Handayani