Rainmaker MaxsTechnician — Field Installation
Admin view

Connected

Changes sync as you work

Job Information

Filled in from the job record — nothing to re-type

In Progress
SPK number
SPK-2026-0139
Date
22 Aug 2026
Customer
Bali Ocean Villas
Site
Villa Sanur 3 · Denpasar, Bali
Technician
Rizky Hidayat
Unit model
POU Pro 200
Unit serial
POU-0442
Ownership
Rental

Site access: Guest privacy — confirm occupancy before arrival

Installation Checklist

Confirm each item on site

6 / 7

Installation Notes

What was done, and anything the client should know

Photos

5 required photos

3 / 5 uploaded

Installed unit

Captured

Water connection

Captured

Drain connection

Drain routing and outlet

Power connection

Captured

Final installation / site

Wide shot of the finished area

Camera uploads are stored on the device and synced with the SPK. Use a sample photo if you are demonstrating without a camera.

Client Signature

Signed on site by the client PIC

Required

Sign here

Use a finger, stylus or mouse

Hand the device to the client PIC to sign22 Aug 2026

Automatic validation

Checked by the system before the job can reach Admin Review

4 outstanding
  • Installation checklist completed6 / 7 items confirmed
  • Unit serial recordedPOU-0442
  • Technician notes completed98 characters recorded
  • Installed unit photo uploadedFull view of the unit in place
  • Water connection photo uploadedInlet coupling and valve
  • Missing drain connection photoRequired evidence for Admin review
  • Power connection photo uploadedOutlet and cable routing
  • Missing final installation / site photoRequired evidence for Admin review
  • Client signature capturedClient PIC must sign on the device