JOB-2026-0140
Admin Installation Review
SPK-2026-0140
PT Surya Hospitality · Surya Bandung Lobby · submitted 23 Aug 2026, 11:35
Awaiting Admin Review
Automatic validation passed
The system confirmed the checklist, unit serial, technician notes, all 5 required photos and the client signature. Approval remains a human decision.
Installation summary
- Customer
- PT Surya Hospitality
- Site
- Surya Bandung Lobby · Bandung
- Unit
- Rainmaker RM500RM-0215
- Ownership
- Rental
- Technician
- Andi Pratama
- Installed on
- 23 Aug 2026, 09:00
Installation checklist
Recorded by the technician on site
7 / 7
- Electric current checked
- Water flow checked
- Water pressure suitable
- Drain confirmed
- Piping within limit
- Final placement approved
- Unit operational
Technician notes
Unit installed behind the concierge desk with a dedicated 16A outlet. Inlet taken from the existing filtered line, drain routed to the pantry floor drain. Output tested at 1.9 L/min, water clear. Client briefed on daily cleaning.
Timestamps
Full audit trail for this SPK
- Job created16 Aug 2026, 09:25
- Scheduled for23 Aug 2026, 09:00
- Saved on device23 Aug 2026, 11:22
- Synced23 Aug 2026, 11:22
- Client signed23 Aug 2026, 11:20
- Submitted23 Aug 2026, 11:35
- Approved—
Installation photos
Tap a photo to inspect it
5 / 5
Installed unit
Captured
Water connection
Captured
Drain connection
Captured
Power connection
Captured
Final installation / site
Captured
Client signature
Captured on the technician device
Verified
Ibu Ratna Dewi
General Affairs
23 Aug 2026, 11:20
Decision
Approval activates the unit and schedules its service cycle
On approval the system will
- Activate RM-0215 and bind it to PT Surya Hospitality
- Record the installation in the unit's permanent history
- Generate the installation handover document
- Schedule preventive maintenance for 23 Dec 2026 (4 months · Rental)