Rainmaker Maxs
JOB-2026-0140

Admin Installation Review

SPK-2026-0140

PT Surya Hospitality · Surya Bandung Lobby · submitted 23 Aug 2026, 11:35

Awaiting Admin Review

Automatic validation passed

The system confirmed the checklist, unit serial, technician notes, all 5 required photos and the client signature. Approval remains a human decision.

Installation summary

Site
Surya Bandung Lobby · Bandung
Unit
Rainmaker RM500RM-0215
Ownership
Rental
Technician
Andi Pratama
Installed on
23 Aug 2026, 09:00

Installation checklist

Recorded by the technician on site

7 / 7
  • Electric current checked
  • Water flow checked
  • Water pressure suitable
  • Drain confirmed
  • Piping within limit
  • Final placement approved
  • Unit operational

Technician notes

Unit installed behind the concierge desk with a dedicated 16A outlet. Inlet taken from the existing filtered line, drain routed to the pantry floor drain. Output tested at 1.9 L/min, water clear. Client briefed on daily cleaning.

Timestamps

Full audit trail for this SPK

  • Job created16 Aug 2026, 09:25
  • Scheduled for23 Aug 2026, 09:00
  • Saved on device23 Aug 2026, 11:22
  • Synced23 Aug 2026, 11:22
  • Client signed23 Aug 2026, 11:20
  • Submitted23 Aug 2026, 11:35
  • Approved

Installation photos

Tap a photo to inspect it

5 / 5

Installed unit

Captured

Water connection

Captured

Drain connection

Captured

Power connection

Captured

Final installation / site

Captured

Client signature

Captured on the technician device

Verified
Client signature

Ibu Ratna Dewi

General Affairs

23 Aug 2026, 11:20

Decision

Approval activates the unit and schedules its service cycle

On approval the system will

  • Activate RM-0215 and bind it to PT Surya Hospitality
  • Record the installation in the unit's permanent history
  • Generate the installation handover document
  • Schedule preventive maintenance for 23 Dec 2026 (4 months · Rental)