Rainmaker MaxsTechnician — Field Installation
Admin view

Connected

Changes sync as you work

Job Information

Filled in from the job record — nothing to re-type

Awaiting Admin Review
SPK number
SPK-2026-0140
Date
23 Aug 2026
Customer
PT Surya Hospitality
Site
Surya Bandung Lobby · Bandung
Technician
Andi Pratama
Unit model
Rainmaker RM500
Unit serial
RM-0215
Ownership
Rental

Site access: Guest area — work before 10:00 only

Submitted for Admin review

The SPK is with the operations team. It stays read-only until they approve it or return it for correction.

Installation Checklist

Confirm each item on site

7 / 7

Installation Notes

What was done, and anything the client should know

Photos

5 required photos

5 / 5 uploaded

Installed unit

Captured

Water connection

Captured

Drain connection

Captured

Power connection

Captured

Final installation / site

Captured

Client Signature

Signed on site by the client PIC

Captured
Signed by Ibu Ratna Dewi — General Affairs23 Aug 2026

Automatic validation

Checked by the system before the job can reach Admin Review

Ready to submit
  • Installation checklist completed7 / 7 items confirmed
  • Unit serial recordedRM-0215
  • Technician notes completed229 characters recorded
  • Installed unit photo uploadedFull view of the unit in place
  • Water connection photo uploadedInlet coupling and valve
  • Drain connection photo uploadedDrain routing and outlet
  • Power connection photo uploadedOutlet and cable routing
  • Final installation / site photo uploadedWide shot of the finished area
  • Client signature capturedSigned by Ibu Ratna Dewi