Rainmaker Maxs
JOB-2026-0141

Admin Installation Review

SPK-2026-0141

Jakarta International School · Sports Complex · submitted 23 Aug 2026, 15:18

Awaiting Admin Review

Automatic validation passed

The system confirmed the checklist, unit serial, technician notes, all 5 required photos and the client signature. Approval remains a human decision.

Installation summary

Site
Sports Complex · Jakarta Selatan
Unit
POU Compact 100POU-0443
Ownership
Rental
Technician
Budi Santoso
Installed on
23 Aug 2026, 13:30

Installation checklist

Recorded by the technician on site

7 / 7
  • Electric current checked
  • Water flow checked
  • Water pressure suitable
  • Drain confirmed
  • Piping within limit
  • Final placement approved
  • Unit operational

Technician notes

Wall-mounted next to the changing room entrance. Inlet from the existing cold line, drain tied into the floor gully. Flow tested at 1.6 L/min. Facilities team shown how to change the pre-filter.

Timestamps

Full audit trail for this SPK

  • Job created16 Aug 2026, 14:00
  • Scheduled for23 Aug 2026, 13:30
  • Saved on device23 Aug 2026, 15:07
  • Synced23 Aug 2026, 15:07
  • Client signed23 Aug 2026, 15:05
  • Submitted23 Aug 2026, 15:18
  • Approved

Installation photos

Tap a photo to inspect it

5 / 5

Installed unit

Captured

Water connection

Captured

Drain connection

Captured

Power connection

Captured

Final installation / site

Captured

Client signature

Captured on the technician device

Verified
Client signature

Ibu Maya Anggraini

Operations Coordinator

23 Aug 2026, 15:05

Decision

Approval activates the unit and schedules its service cycle

On approval the system will

  • Activate POU-0443 and bind it to Jakarta International School
  • Record the installation in the unit's permanent history
  • Generate the installation handover document
  • Schedule preventive maintenance for 23 Dec 2026 (4 months · Rental)