Rainmaker Maxs
JOB-2026-0142

Admin Installation Review

SPK-2026-0142

PT Nusantara Digital · Menara Nusantara — Level 21 · submitted —

Scheduled

Not awaiting review

This SPK is not currently submitted for review.

Installation summary

Site
Menara Nusantara — Level 21 · Jakarta Selatan
Unit
Rainmaker RM500RM-0214
Ownership
Rental
Technician
Andi Pratama
Installed on
24 Aug 2026, 09:00

Installation checklist

Recorded by the technician on site

0 / 7
  • Electric current checked
  • Water flow checked
  • Water pressure suitable
  • Drain confirmed
  • Piping within limit
  • Final placement approved
  • Unit operational

Technician notes

No notes recorded.

Timestamps

Full audit trail for this SPK

  • Job created20 Aug 2026, 14:20
  • Scheduled for24 Aug 2026, 09:00
  • Saved on device
  • Synced
  • Client signed
  • Submitted
  • Approved

Installation photos

Tap a photo to inspect it

0 / 5

Installed unit

Not uploaded

Water connection

Not uploaded

Drain connection

Not uploaded

Power connection

Not uploaded

Final installation / site

Not uploaded

Client signature

Captured on the technician device

Missing

No signature captured

The SPK cannot be approved without the client PIC signature.